Showing posts with label Seaport Square. Show all posts
Showing posts with label Seaport Square. Show all posts

Monday, January 30, 2023

Conservation Commission Meeting February 1st

The Boston Conservation Commission (ConCom) will hold its next Wednesday bi-weekly public hearing on:

February 1, 2023
6:00 pm
Dial-in audio: 929-205-6099
Meeting ID: 686 458 2044#

The Commission reviews projects to determine what conditions, if any, the Commission will impose in order to protect the interests of the public and private water supply, groundwater, prevention of pollution, flood control, prevention of storm damage, protection of fisheries and land containing shellfish, and protection of wildlife habitat. View Full Agenda

Neighborhood Agenda Item

Notice of Intent for DEP File No. 006-1911 and BOS File No. 2023-002 from Nitsch Engineering on behalf of Seaport Square Development Company LLC for proposed roadway improvements including roadway widening, median installation, plantings, utility adjustments, electrical pole construction, and electrical conduit installation, located at Congress St, West Service Road, Boston Wharf Road, and the Summer Street Bridge, South Boston, MA (LSCSF)

Acceptance of the Order of Conditions:

Notice of Intent (NOI) for DEP File No. 006-1910 and BOS File No. 2023-001 from Beals and Thomas, Inc. on behalf of BentallGreenOak for the proposed redevelopment of an existing parking garage into a 4-story laboratory/office building, located at 17 Farnsworth St, South Boston, MA (LSCSF). View NOI from Jan 18th meeting.

Notice of Intent for DEP File No. 006-1903 from Nitsch Engineering, Inc. on behalf of DIV Black Falcon, LLC for the proposed 4-floor addition to an existing building, the expansion of the existing parking lot, and other associated improvements, located at 88 Black Falcon Avenue, South Boston, MA (LSCSF, 100-foot Buffer to Coastal Bank). View NOI from Jan 18th meeting.

You can also submit written comments or questions to cc@boston.gov or via Twitter.

Monday, December 05, 2022

What You Need To Know This Week

Seaport Square planning is nearing completion. Make sure it is adding what you want to the neighborhood by attending tonight's (12/5) public meeting. The City is working on a permanent outdoor dining program and wants your feedback Monday (12/5) or Tuesday (12/6) night. On Wednesday night (12/7), there is a community meeting for another Life Sciences building project in Fort Point's historic district. The Fort Point Channel Landmark District Commission is holding their December meeting Thursday (12/8) night. If you are a Fort Point resident or business property owner who is interested in serving as a Fort Point Landmark Commissioner, please contact FPNA.

December 5: The Boston Planning & Development  Agency (BPDA) is hosting a Seaport Square Public Meeting at 6pm to discuss Notice of Project Change (NPC) and amendments to the Planned Development Area (PDA) including project impacts and mitigation. Attend to find out what remains to be be built and give feedback on what is needed to create a complete neighborhood. Will it be climate resilient, reduce urban heat and protect the neighborhood from flooding? Will it include civic, cultural spaces? A park? Affordable Housing? Residential homes separate from Life Sciences Labs? How many more labs do we need? Register. Also, see December 6th for update at BCDC.

Seaport Square Proposed Changes in blue

December 5: Outdoor Dining Listening Session at 6pm to hear from residents and restaurants on tbe goals of a permanent outdoor dining program with updates from the City. Register. This listening session will be repeated December 6th. Send questions/comments to outdoordining@boston.gov

December 6:  Outdoor Dining Listening Session at 6pm to hear from residents and restaurants on tbe goals of a permanent outdoor dining program with updates from the City. Register. This listening session is a repeat the one held December 5th. 

December 6: Seaport Square is at the Boston Civic Design Commission (BCDC) to provide an update on changes to building uses, location, and open space in the PDA and NPC.

December 7: 7 Channel Center Public/IAG Meeting at 6pm The proposed project is to redevelop an existing historic 3 story building into a 9 story office/labs Life Sciences building. This project requires a Notice of Project Change and an amended Planned Development Area. What is the right use, residential or labs? Public safety concerns? What about ground floor use to activate the street and provide a service to neighbors?

7 Channel Center Life Sciences Labs Proposal

December 8: Fort Point Channel Landmarks District Commission December meeting at 6pm. View agenda 

Thursday, December 01, 2022

Holiday Events With A Mix of Life Sciences, Seaport Square Expansion, Climate Resilience & Cycling

updated 12/1 with Mayor Wu's Sunday, December 4 Enchanted Trolley Tour & Tree Lighting and new 7 Channel Center Public meeting date.

Wishing you a Happy Thanksgiving and inviting you all to enjoy holiday events and a couple developments going on in the neighborhood. 

November 29: FPNA Fort Point Seaport Holiday Social at The Holiday Market at Snowport from 6pm-8pm. R.S.V.P. required.

November 30: Boston Harbor Now’s Harbor Use Forum on CFROD (Climate Resilient Flood Overlay District) at 8:30am. Find out how designs are evolving, and what designers, developers, and advocates should know about CFROD.

November 30: 17 Farnsworth St Impact Advisory Group Public Meeting at 6pm. Replace existing, 361-vehicle parking garage built in 1986 with four-story life science building. In addition, per CFROD, dry flood-proof at least two feet above Sea Level Rise Base Flood Elevation (19.5 ft. BCB).

December 1: South Boston Christmas Stroll, Shop, Dine, Splurge, starts at 4pm. View the details and where Santa is visiting at 2022 Christmas Stroll Schedule - South Boston Chamber of Commerce

December 1: Winter Cycling Clinic with Seaport TMA & MassBike from 5pm to 6:30pm. Curious about biking into work in the winter, but hesitant about how to get going? Learn best practices about cycling in the window. Meet up at The Benjamin, 25 Northern Ave.

December 2: LightUp Seaport from 5pm - 9pm with holiday tunes, a celeb appearance by Betty the Yeti, and annual tree lighting on Seaport Common. Enjoy special offers and sparkling surprises at neighborhood businesses as you stroll.

December 4: 26th Annual Enchanted Trolley Tour & Tree Lighting with Mayor Wu and Santa at Medal of Honor Park (E. Broadway & M Streets). Festivities start at 2pm. 

December 5: Seaport Square Public Meeting at 6pm to discuss Notice of Project Change and amendments to the Planned Development Area including project impacts and mitigation.

December 7: 7 Channel Center Public/IAG Meeting at 6pm The proposed project is to redevelop an existing historic 4 story building into a 9 story office/labs Life Sciences building. This project requires a Notice of Project Change and an amended Planned Development Area.

ongoing through December 31st, the Holiday Market at Snowport welcomes over 120 small businesses to fill your gift list. 

originally published 11.23.22

Thursday, November 03, 2022

Around The Hood: This Week

updated 11/3/22 with Nov. 2nd Cannabis meeting & Nautilus meeting recordings plus City Hall To Go Truck Nov. 4th.

October 31: “Trick or Treat along East and West Broadway” from 4-6 p.m. Look for orange and black posters inviting the children to stop by for a treat.  If you are starting on West Broadway going toward East Broadway, walk on the odd-numbered (southern) side of the street. If you are starting on East Broadway heading to West Broadway, walk on the even-numbered (northern) side of the street. Hosted by the South Boston Chamber of Commerce and the South Boston NDC. 

November 2: 2nd Public Meeting on Proposed Zoning Amendment of Cannabis Establishments at 6pm. View  November and August meeting recording and presentation plus amended text. 

November 2: MassDOT Revised Bus Network Public Meeting at 6pm. Share your comments.

November 2: Nautilus Restaurant (300 Pier 4 Blvd) Abutters Meeting at 7pm via Zoom. Requesting to amend entertainment license to include live entertainment indoors only (4 instrumental/vocalist, tvs, and dj). Indoor hours until 2am with existing non-live entertainment on patio until 11pm. To view meeting enter password, W&*@Ld6z

November 3: Early voting and mail-in ballot drop off at the ICA from 12pm to 8pm plus free admission to the musuem after voting. 

November 3: Seaport Square Impact Advisory Group Public Meeting at 6pm. View Notice of Project Change for changes in uses, particularly residential to labs, along with the introduction of biosafety 3 labs intermingled with housing, a reduction in green park space important for climate resiliency to prevent or manage flooding and heat island impacts.

November 4: City Hall To Go Truck with City Council President & District 2 Councilor Ed Flynn at the Municipal Lot at 450 W Broadway, from 3:30 - 5 p.m. You can apply for resident parking permits or dog licenses, request birth, death, or marriage certificates, paying or appealing parking tickets, etc... without making the trip to City Hall. 

November 12*: Let's Beautify Fort Point. Come get your hands dirty planting daffodils from 10am -1pm. Meet up at Wormwood Park. Details and to sign up. *new date

originally published 10.31.22

Monday, August 01, 2022

A Look At What's Happening This Week & Next

updated 8/1/22 with August 1st Abutters meeting recording and August 2nd National Night Out.

What's Developing in the Neighborhood: 

July 19: 17 Farnsworth Street Public Meeting at 6pm. Replace existing, 361-vehicle parking garage built in 1986 with four-story Life Sciences building with mechanical penthouse set back from the roof edges to minimize visibility from the ground. No onsite accessory parking. Per Coastal Flood Resilience Overlay District, dry flood-proofed at least two feet above Sea Level Rise Base Flood Elevation (19.5 ft. BCB). For additional project details, explore the Project Notification Form. Comment deadline: July 29, 2022

July 19: 776 Summer St (Edison Power Plant) Phase 1 Impact Advisory Group Public Meeting at 6pm. Phase 1 will be located on 8.4 acres / 364,409 square feet within the approximately 15.2 acre (approximately 661,500 square foot) parcel of land known as and numbered 776 Summer Street in South Boston. It includes the rehabilitation of the Edison Turbine Halls 1, 2, and 3 and the construction of the buildings on Blocks D and F.  

July 20th: Blue Bottle (113 Autumn Lane) Abutters Meeting at 4pm. Requesting a Common Victualler License. Public welcome.

July 20th: Madras Dosa Co (55 Wharf Rd) Abutters Meeting at 5pm. Requesting to extend operating hours to 2 AM on weekdays and 3 AM on the weekends plus add third party delivery services. This fast, casual Indian restaurant does not serve alcohol.  Public welcome.

July 20: Moakley Park Design Phase 1 Community Meeting at 6pm. Register.

July 20: BPDA Proposed Zoning Amendments of Floor Area and Other Definitions Public Meeting from 6pm-7:30pm. The proposed amendments will update several terms in the definition sections in Articles 2 and 2A, including Filled and Flowed Tidelands, Gross Floor Area, and Floor Area Ratio (FAR) to make clear that tidelands/land underwater is not included in lot area and FAR calculations and that above-grade parking structures are included in Gross Floor Area. View meeting details and documents.

July 25: Seaport Square (Notice of Project Change) Impact Advisory Group Meeting from 6pm-8pm. Public is welcome to attend. If you missed July 11th Public Meeting, view the presentation and video recordingComment deadline: July 29, 2022

July 27: 7 Channel Center (Notice of Project Change) Public Meeting from 6pm - 8pm. The proposed project is to redevelop 7 Channel Center Street in the Fort Point neighborhood of Boston (the “Redevelopment Site”), by constructing a new office/research and development (“R&D”) building. View Notice of Project Change.

July 27 - August 4th: Better Bike Lanes Are Coming to A Street. The Boston Transportation Department is hosting a variety of times to talk with you in the A Street Park. 

August 1: Grace by Nia Abutters Meeting at 5pm. 1 Seaport Square (part of the former movie theater space). Requesting a 7 day All Alcoholic Beverages License, Live & non-live Entertainment License. View Abutters meeting and enter passcode CmAQ64S!  If you have any questions or comments about this proposal, please contact Anna White, South Boston Liaison, Mayor’s Office of Neighborhood Services.

August 2: Tishman Speyer 232 A Street (former Gillette Parcel 3 parking lot) Coffee Hour at Binford Park (end of Binford St.to the left of the Pump House when facing the Channel) from 8:30am - 11am. Come meet the Tishman Speyer/Breakthrough Properties project team to learn about this 2.5 acre Life Sciences project within the 100 Acres Master Plan.

August 2: National Night Out in South Boston at Moakley Park (near JFK/Umass T stop) from 5pm - 8pm. Meet Mayor Michelle Wu,incoming Police Commissioner Michael Cox, BPD Command Staff, and your neighbors! Free kids’ activities, food and entertainment! Awards for Boston’s crime watch groups! For more information, call the Neighborhood Crime Watch Unit at 617-343-4345.

August 3:  776 Summer St (Edison Power Plant) Phase 1 Public Meeting at 6pm (replaces the original meeting scheduled for July 26th). See July 19th phase 1 project description under July 19th. Register.

originally published 07.18.22

Wednesday, July 06, 2022

Neighborhood Summer Gathering June 28th & July Happenings

updated 7/06/22 with 25 Thomson Place restaurant abutters meeting. 

Join us for a

Summer Fort Point Seaport
Hybrid Neighborhood Gathering*

Tuesday, June 28, 2022
6 pm to 8 pm
in person at District Hall (75 Northern Ave.)
 or
Online via Zoom

featuring

Our C-6 Community Service Officers


Neighborhood Discussions
Construction After Hours & Weekends
Life Sciences Impacts
Chapter 91 Public Spaces Ground Truthing
Open Community Questions /Updates

introducing

Boqueria Tapas Bar and Restaurant
 25 Thomson Place
requesting support for an All Alcoholic Beverages License

&

Moxies
 899 Congress Street 
requesting support for an All Alcoholic Beverages License


plus
Neighborhood News

*Please note we do not meet in July or August. Our next gathering will be September 27th.

____________________________________________________________________

Upcoming Neighborhood Happenings

June 24: Final Friday's Open Mic Night from 6pm-9pm at Assemblage Art Space, 70 Sleeper St. You may discover the next big musician, poet, storyteller... Performers should arrive at 5pm to sign up. R.S.V.P.

June 26: Seaport x Black Owned Bos. Market from 12pm to 6pm. Check the Boston Seaport calendar for Seaport Sweat, bike tune-ups & other events. 

June 26: Opening reception of "Wavelength" by artists Lisa Knox and Nancy Grice from 3pm - 6pm at The Gallery at 249 A, 249 A Street.

June 27: 17 Farnsworth Impact Advisory Group Public Meeting at 6pm. Replace existing, 361-vehicle parking garage built in 1986 with four-story life science building with mechanical penthouse set back from the roof edges to minimize visibility from the ground. No onsite accessory parking. Per Coastal Flood Resilience Overlay District, dry flood-proofed at least two feet above Sea Level Rise Base Flood Elevation (19.5 ft. BCB).

June 28: FPNA Fort Point Seaport Neighborhood Gathering 6-8pm at District Hall (75 Northern Ave) and via Zoom (details above).

June 29: Mayor Wu's Neighborhood Coffee Hour at Medal of Honor Park (East 3rd & M Streets) from 9:30 am - 10:30 am. It is a unique opportunity to speak directly with the Mayor and staff from City departments about open space and your neighborhood. Dunkin’ will be on-site to keep Bostonians runnin’ with coffee and MUNCHKINS® donut hole treats. In addition, each family in attendance will receive a free flowering plant provided by the Boston Parks and Recreation Department, while supplies last. 

July 7: Seaport Circle (701 Congress) Impact Advisory Group Public Meeting at 6pm.The Project will construct a 13-story laboratory/research & development and office building located on Parcel H totaling approximately 587,000 GFA, a two-story job training/non-profit center on an adjacent parcel totaling approximately 16,000 GFA, and an elevated walkway that connects these two buildings and surrounding properties. Register.

July 11: Abutters Meeting at 4:30pm to ask for support of an all alcohol license for Boqueria Tapas Bar & Restaurant at 25 Thomson Place. Public is welcome to attend the virtual meeting. 
Meeting Link: https://us06web.zoom.us/j/82253330580
Meeting ID: 822 5333 0580
Via phone +1 646 558 8656 and enter the Meeting ID above. 

July 11: Seaport Square Notice of Project Change (NPC) Public Meeting at 6:00 pm. The proposed NPC includes changes to the use and programming of several buildings, the elimination of a previously proposed building, and the expansion of open space. Read all the details on the NPC and the Planned Development Area Amendment

July 19: 17 Farnsworth Street Public Meeting at 6pm. For additional project details, explore the Project Notification Form.

July 19: 776 Summer St (Edison Power Plant) Phase 1 Impact Advisory Group Public Meeting at 6pm. Phase 1 will be located on 8.4 acres / 364,409 square feet within the approximately 15.2 acre (approximately 661,500 square foot) parcel of land known as and numbered 776 Summer Street in South Boston. It includes the rehabilitation of the Edison Turbine Halls 1, 2, and 3 and the construction of the buildings on Blocks D and F. Register.

July 26:  776 Summer St (Edison Power Plant) Phase 1 Public Meeting at 6pm. See phase 1 project description above. Register.

Tuesday, October 29, 2019

Fort Point Seaport Gathering: Life Sciences, Seaport Winter & Hot Topics

Fort Point Seaport Neighborhood Gathering

Tuesday, October 29, 2019
6 pm to 8 pm
Capital One Café
57 Seaport Blvd

featuring

National Development & Alexandria Real Estate
with David Manfredi, Elkus Manfredi Architects
New Life Sciences Building
15 Necco Street

(former GE Headquarters)

&

Seaport Square
Beer Garden to Winter Skating & Warming Tent
Yanni Tsipis, WS Development


plus
Neighborhood Hot Topics


Special Thanks to Capital One Cafe for hosting the neighborhood

Tuesday, January 29, 2019

Be In The Loop With Local Art

Did you know Artists For Humanity recently expanded their EpiCenter? This Wednesday, January 30 from 5 pm - 7 pm, Artists For Humanity invites you to their first Open Studios of 2019.  Tour bustling studios, meet inspiring teens, preview the latest projects, network with local creatives, and mingle over wine and cheese. The event is free, family-friendly, and open to the public. Artist For Humanity is located at 100 West 2nd Street next to the A Street Park and just blocks away from the Broadway red line T station.
Artists For Humanity
The same evening (January 30), the Boston Society of Architects (BSA) is hosting an opening reception of  Surface Tension: Architectural photographs from Peter Vanderwarker and Boston Up: Infrared photographs by Neal Rantoul from 6 pm - 8 pm in the BSA Space at 290 Congress Street. R.S.V.P. for this free event.  On view through June 1, 2019. 
Peter Vanderwalker
Start February with the Fort Point Arts Community (FPAC) opening reception of Melt , a reinterpretation of Nordic myths — with feminist and science fiction twists through video, photography and sculpture by artists Isabel Beavers and Laine Rettmer. The artists created Melt during a residency in Iceland. The opening reception is Friday, February 1st from 6 pm - 8 pm at FPAC Gallery, 300 Summer Street. More details.
Melt
The Loop, an interactive art experience, has landed at One Seaport Square (between Showcase Icon and Scorpian). Take a seat in these giant circular structures, pump the handlebar, and watch a story unfold. The installation will be around until February 17, 2019. More details.
The Loop
On Sunday, February 10th at 2 pm, the Fort Point Theatre Channel presents Her Story Is Translated: Perspectives on Poetry, Playwriting, and Music in Arabic and English coordinated by Jennifer Jean and Amy Merrill. Her Story Is continues with this special event highlighting the process of “translation” in the poetry, plays, and music between and among several artists living in Iraq and in the United States. The free event will take place in Art Under The Stairs at Midway Artist Studios located at 15 Channel Center Street. To learn more about Her Story Is visit the Fort Point Theatre Channel. 
Her Story Is Translated

Thursday, November 16, 2017

Discover Newly Changed Plans For Seaport Square

updated 11/16/17: Seaport Square at BPDA Board for approval 11/16/17 at 6:10pm (per agenda) at City Hall, 9th floor, room 900. View Seaport Square Board Memo and revised PDA.

updated 10/20/17: Seaport Square returns to BCDC on Tuesday, October 24 at 5pm, room 937A, City Hall. Public invited to attend. 

updated 10/18/17: Remember to submit public comments by end of day, October 27, 2017 (details below).


Last week (9/12/17) WS Development, who in 2015 purchased the remaining 12.5 acres of Seaport Square, filed a Supplemental Information Report (SIR) to their Notice of Project Change submitted seven months prior. The filing responds to the many public comments submitted from Boston residents, performing art organizations and others including the Boston Planning & Development Agency (BPDA) and Boston Parks & Recreation Department. WS Development also filed an amendment to Seaport Square Planned Development Area 78  three days later.

Two of the largest calls came in response to the jettisoning of a 200,000 sf arts center and the elimination of Seaport Hill Park. 

Discover the new plans for performing art spaces, open green spaces and other changes at: 

  • Seaport Square IAG Meeting: November 8, 2017 from 6:30 pm - 8:00 pm at District Hall, 75 Northern Ave. The Impact Advisory Group (IAG)will be discussing the changes made to the PDA and cooperation agreement. The public is welcome to listen. View revised PDA
  • Boston Civic & Design Commission (BCDC): October 24, 2017 at 5 pm in room 937A, City Hall.  View Presentation.
  • Seaport Square Community Meeting: October 4th from 6pm - 8pm at District Hall, 75 Northern Ave. 
  • Seaport Square Community Meeting: September 27th from 6pm - 8pm at the Seaport Hotel, in Seaport Ballroom #1, 1 Seaport Lane. View Presentation.
  • Seaport Square IAG Meeting: September 20 from 6:30 pm - 8:00 pm at District Hall, 75 Northern Ave. The Impact Advisory Group (IAG)will be discussing the changes made to the proposal. The public is welcome to listen.
  • Boston Civic & Design Commission (BCDC): September 19, 2017 at 4 pm in room 937A, City Hall. View Presentation

View the Seaport Square Supplemental Information Report and amendment to Seaport Square Planned Development Area 78.
Public Comment Deadline: October 27, 2017
Submit comments to BPDA Project Manager Michael Rooney

Related Posts
originally published 9.18.17

Friday, March 10, 2017

Seaport Square IAG Public Meeting

The Boston Planning & Development  Agency (formerly BRA) will be holding an Impact Advisory Group (IAG) Public Meeting regarding Seaport Square on: 

Monday, March 13, 2017
6pm - 8pm
District Hall
75 Northern Avenue

The remaining 13 acres of the 23 acre Seaport Square is being proposed as a 7,680,010 Million square feet of development consisting of 3.2 million residential, 2.8 million of new office, 476,800 square feet of hotel, a cultural and educational center and 1.12 million square feet of multi-level retail, restaurant and entertainment.

The public is welcome to attend. The purpose of this meeting is a little different than that of a traditional community meeting. As part of the development review process, IAG members work closely with BPDA staff to identify the impacts of a project and recommend appropriate community benefits to offset those impacts. IAG meetings prioritize discussion between the project proponent (i.e. the developer) and IAG members. If time remains at the end of the meeting, BPDA staff will open the floor to other community members in attendance. 

The BPDA held two community public meetings on Feb 16th and Feb 27th focused primarily on proposed Seaport Square master plan changes to the public realm and open space, and the arts and cultural space leaving many more aspects such as additional millions in square footage (massing) to be addressed at future meetings such as this one. View Seaport Square presentation at March 7th Boston Civic and Design Commission.

Public Comment Deadline: March 27, 2017 
Submit comments to Project Manager Gary Uter

Monday, February 27, 2017

Seaport Square: The Final Parcels

updated 2.21.17 with Feb. 16th meeting focus (see asterisk below)

The final parcels (approximately 13 acres) of the Seaport Square development are up for review by the community on: 

Monday, February 27, 2017
6 pm - 8 pm
District Hall
75 Northern Ave

The developer, WS Development, will be discussing their proposed changes to the remaining Seaport Square parcels (blocks). Read the notice of project change filed with the BPDA (Boston Planning and Development Agency) on February 7th. 



Seaport Square is approximately a total of 23 acres of land, defined by an L-shaped series of development blocks and generally bounded by Northern Avenue and Seaport Boulevard (between Old Sleeper Street and Pier 4 Boulevard) and by Stillings Street, Boston Wharf Road, East Service Road and Pier 4 Boulevard and B Street (between Seaport Boulevard and Summer Street).

*Comments made at the earlier February 16th public meeting maybe incorporated or responded to at the February 27th meeting. The first community meeting focused primarily on the public realm (open space) with some discussion of arts, cultural and civic uses and transportation. The entire project also encompasses office, residential and retail uses. 
originally published 2.10.17

Thursday, February 02, 2017

Seaport Square Open House Tonight

WS Development is hosting an Open House with the Boston Planning and Development Agency (BPDA) on:
Thursday, February 2, 2016
6 pm - 8 pm
District Hall
75 Northern Avenue

Come hear about proposed changes to the planned development area (PDA) for this final Seaport Square development parcel. This will be the fourth amendment to PDA #78. Seaport Square is 6.5 Million square feet of development consisting of 2.5 million residential, 1.5 million of new office, two hotels, a cultural and educational center and 1.5 million square feet of multi-level retail, restaurant and entertainment according to the BPDA website.

Tuesday, January 31, 2017

FPNA Kicks Off New Year With WS Development

Fort Point Neighborhood Association
2017 Neighborhood Kickoff

Tuesday, January 31, 2017
6 pm
Factory 63
63 Melcher Street

featuring
Everything Seaport Square
Yanni Tsipis & Todd Norley
WS Development

and introducing
Mastro's Ocean Club
22 Liberty Drive
requesting an all alcoholic beverage license

plus

Neighborhood Updates


*** featured restaurant: La Casa de Pedro ***


originally posted 1.25.17

Wednesday, February 24, 2016

Seaport Square M Block (Residential & Retail) Public Meeting

Update: Comment period deadline extended to March 1st.

Join the Boston Redevelopment Authority to learn about Seaport Square's M Block on:


Monday, February 22, 2016
6 pm - 8 pm
District Hall
75 Northern Avenue

The meeting will review updates to plan development area (PDA) 78 in regards to the M block parcel of Seaport Square. Seaport Square in its entirety will connect the Fort Point, Fan Pier, Pier 4, and Waterside Place.  

The proponent, Boston Seaport M1&2 Land, LLC, proposes to construct an approximately 1,012,000 gross square foot mixed-use development containing approximately 735 residences, approximately 125,000 square feet of retail/commercial space and a below-grade garage containing approximately 560 lined parking,

Project Manager: Gary Uter
Close of comment period: March 1st



Autumn Lane

Seaport East

Seaport West


originally published 2.17.16

Wednesday, January 20, 2010

Seaport Square Meeting, Wed, 1/27





Details on the project can be found on their site:
http://www.seaportsquare.com/sub_page.html


Seaport Square Public Meeting
6:00 – 8:00 PM
Wednesday, January 27th, 2010

Condon Elementary School
200 D Street, South Boston


Project Proponent: MS Boston Seaport, LLC
Project Description: In response to the comments raised during the Project Notification Form phase of review the Proponent submitted a Draft Project Impact Report on November 30, 2009, showing development on twenty-three (23) acres of vacant parking lots in South Boston, which are generally bounded by Northern Avenue, Seaport Boulevard, Congress Street and Summer Street, in the South Boston Waterfront known as “Seaport Square”. The proposed project contemplates approximately twenty-three (23) buildings on twenty (20) city blocks with a total of approximately 6.5 million square feet of development in a mixed-use project that will include approximately 2.8 million square feet of residential, approximately 1.3 million square feet of office and research, approximately 1.3 million square feet of retail and entertainment uses, approximately 600,000 square feet of education and cultural space, approximately 500,000 square feet of hotel space, as well Boston as below-grade parking garages that will accommodate approximately 6,500 cars. The Redevelopment Proposed Project will also include a 1.25 acre “Seaport Square Green” and a 0.75 acre “Seaport Hill” as well as other open spaces throughout the proposed project.


CLOSE OF COMMENT PERIOD: Tuesday, February 16, 2010


Tuesday, June 10, 2008

Barking Crab Not Being Moved for Seaport Square

$3.5 billion city neighborhood
Developer John Hynes makes Seaport Square plan official
By Scott Van Voorhis | Tuesday, June 3, 2008 | http://www.bostonherald.com
| Real Estate

Photo by Seaport Square
A rebuilt Barking Crab will not be part of Seaport Square, a sweeping
proposal for millions of square feet of new development near South
Boston¹s waterfront.

Hub developer John Hynes, who officially filed his Seaport Square
proposal yesterday at City Hall, confirmed he has dropped his efforts
to lure the harborside seafood eatery into his project.

The proposal failed to win over the eatery¹s owners, who have opted to
stay in their rustic and colorful perch right on the waterfront.

³The Barking Crab is in a very unique location there,² said George
Regan, the restaurant¹s spokesman. ³There is only so much waterfront
in this city.²

Undaunted, Hynes said he¹s now pushing ahead with plans for what would
be the largest new development project in Boston history.

The $3.5 billion project would transform 23 acres of surface parking
lots across from the J. Joseph Moakley U.S. Courthouse into a new
neighborhood of 5,000 residents.

Hynes wants to start work later this year on a first phase of two
smaller residential buildings totaling 110 units, with 46,000 square
feet of shops and retail on the first two floors. There are also plans
to move and rebuild the Our Lady of Good Voyage Chapel on a nearby site.

³Not since the filling of the Back Bay has Boston had an opportuntiy
to create a new neighborhood,² Hynes¹ development team claims in plans
filed with the Boston Redevelopment Authority. ³Seaport Square in
South Boston will be Boston¹s first 21st century neighborhood.²

Hynes hopes to start work on the project¹s second phase in 2010.

That includes most of Seaport Square¹s 2,500 residential units, 1.4
million square feet of office and lab space, 1.25 million square feet
of retail, and a 700-room hotel.

There are also plans for a pair of schools for 2,000 students - a
public, pre-K early learning center for 200 students and a private
school for another 1,800 children.

Saturday, May 10, 2008

Seaport Square Community Meeting, 5/21

The Boston Redevelopment Authority (BRA) and MS Boston Seaport LLC (Owner) invite you to attend the upcoming public meeting where both the BRA and the Owner will be available to summarize and respond to your feedback and any other questions and comments about Seaport Square received to date. This meeting concludes a series of five community meetings hosted by the BRA and the Owner prior to an official project filing with the city and state regulatory agencies.

Presentations made at the first four public meetings are also available for review at www.SeaportSquare.com and you may also submit any comments or questions to us from the website in advance of the meeting.

Wednesday, May 21, 2008
6:30-8:00 pm
Condon Elementary School
200 D Street
South Boston, MA

Tuesday, April 29, 2008

Public Meeting on Seaport Square Tomorrow, Artists for Humanity

There's a meeting tomorrow night on the Seaport Square development project:

Seaport Square Meeting
Public Meeting, Artists for Humanity, 100 W. 2nd St, SB
Wed, 04-30-2008 06:30 PM - 08:30 PM



Some background on the project:

GALE International (the developer) has a Seaport Square Marketing Website
(obviously take this with a large grain of salt; Tony Goldman had a similar glossy picture of the future before he came into Fort Point)

And there's an ArchBoston Thread discussing the project.

Saturday, April 12, 2008

Seaport Square Development Meeting, April 17th and 30th

Community meetings are being held to identify planning principles to guide the development of Seaport Square, the 23-acre area in South Boston owned by Gale International, Morgan Stanley, and WS Development.

Thursday, April 17, 2007
Boston Convention & Exhibition Center, Room 251
415 Summer Street, South Boston
6:30PM

Wednesday, April 30, 2008
Artists for Humanity
100 West Second Street, South Boston
6:30PM


Valerie Gingrich
waterfront | south boston
Boston Redevelopment Authority