Wednesday, July 08, 2026

Fort Point Landmarks July 2026 Meeting

updated 8/8/26 with presentations. 

THE FORT POINT CHANNEL LANDMARK DISTRICT COMMISSION

will hold a public hearing on:
Thursday, July 9, 2025 
6:00 PM

This hearing will be held virtually and NOT in person.

You can participate in this hearing by going to the Zoom meeting link or by calling 646-828-7666 and entering meeting id 165 837 1389#. You may also submit written comments or questions to FortPointLDC@boston. 

I.  RATIFICATION OF 12/11/25 PUBLIC HEARING MINUTES

II.  VIOLATION

VIO.26.1080 15 CHANNEL CENTER STREET
Applicant: Jarrell Perkins
Proposed Work: Unapproved installation of doors. See application 25.0935 FPC.

III. DESIGN REVIEW HEARING

APP # 26.1101 FPC 35 THOMSON PLACE
Applicant: Nate Turner
Proposed Work: Lettering surface applied to an existing steel lintel; Vinyl lettering surface applied to an existing window/ storefront; A barbershop pole to be placed at the brick pier at the corner 35 Thomson abutting 25 Thomson.

APP # 26.1102 FPC 30 THOMSON PLACE
Applicant: Nate Turner
Proposed Work: Install new temporary signage at front. 

IV. ADMINISTRATIVE REVIEW/APPROVAL
APP # 26.0783 FPC 15 CHANNEL CENTER STREET: Emergency approval – Temporary signage at entry doors and awning. Extension of the 3/20/2026 approval. 

APP # 26.1090 FPC 249 A STREET: Installation of (1) internally illuminated blade sign to read "Gallery at 249 A”

V. STAFF UPDATES

VI. PROJECTED ADJOURNMENT: 7 PM

Members: Kirsten Hoffman, Sue Goganian, Vacancy, Thomas Rodde, Vacancy Alternates: Vacancy, Raber Umphenour 

originally published 6.30.26

Tuesday, July 07, 2026

About The Neighborhood This Week

 Here is a quick glance at what is happening about the neighborhood this week. 

July 7th:  Reserved Channel Development Public Meeting on MEPA draft Environmental Impact Report at 6pm.

July 9th: Oil and Water, Paintings and Drawings by Dan Osterman and Bruce Rogovin Opening Reception from 6pm to 8pm at the Gallery at 249 A. 

July 9th: Fort Point Channel Landmark District Commission Public Meeting at 6pm

July 11th: Sail Boston Parade of Sail from 9am to 4pm. Public boarding of Tall Ships from 5pm to 10pm. Fireworks off of Fan Pier at 9:15pm.

July 12th: Sail Boston Public Boarding of the Tall Ships continues from 10am to 10pm through Wednesday.

What To Know To Navigate Sail Boston: Public Viewing & Boarding, Parking Impacts & Street Closures + Fireworks

Sail Boston Community Shuttles: Massport Free Public Viewing Event Parade of Sail: July 11th, 9am-3pm, Massport Marine Terminal Information here / No sign up required to participate. Catch a free shuttle every 30 minutes at each stop between the hours of 9:00am - 3:00pm: South Boston Catholic Academy (688 E Broadway), South Boston Neighborhood House/The Ollie (136 H St), Labouré Center (275 W Broadway), A Street x Congress Street

Sail Boston 2026 Traffic / Parking Impacts 🚘 (July 10th-11th)
Castle Island

No Parking
Friday, July 10 – Saturday, July 11, 2026

10:00 PM (Fri.) – 6:00 PM (Sat.)

  • Day Boulevard (both sides): K Circle to Sullivan’s at Castle Island

  • Shore Road

  • East Side of Farragut Road

  • East 1st Street: Angled Parking between O Street and Farragut Road

Road Closures
Saturday, July 11, 2026

6:00 AM – 6:00 PM

  • Day Boulevard: K Circle to Sullivan’s at Castle Island

  • Shore Road


Marine Park

No Parking

Friday, July 10 – Saturday, July 11, 2026

11:59 PM (Fri.) – 6:00 PM (Sat.)

  • Seaport Boulevard (both sides): Sleeper Street to Haul Road

  • All Roads (both sides) between Fid Kennedy Avenue and Shoreline Road

  • Fish Pier (both sides)

Road Closures
Saturday, July 11, 2026

6:00 AM – 6:00 PM

  • Seaport Boulevard: B Street to Congress Street

  • All Roads north of Fid Kennedy Avenue and east of Tide Street

Seaport

No Parking

Friday, July 10 – Saturday, July 11, 2026

11:59 PM (Fri.) – 6:00 PM (Sat.)

  • Seaport Boulevard (both sides): Sleeper Street to Haul Road except for Valet Operations

  • Northern Avenue (both sides): Sleeper Street to Pier 4 Boulevard

  • All Roads between Northern Avenue and the Waterfront

  • Fish Pier (both sides)

Road Closures

Saturday, July 11, 2026

6:00 AM – 6:00 PM

  • Seaport Boulevard: B Street to Congress Street

  • All Roads between Northern Avenue and the Waterfront


Public Boarding of Ships Around The Harbor⛵

Saturday, July 11 · 5:00 PM – 10:00 PM
Sunday, July 12 – Wednesday, July 15 · 10:00 AM – 10:00 PM
Visit Sail Boston for complete details and a full schedule of events. 

Boston Harbor Firework Shows 🧨

7/11/26:  Sail Boston show #1, 9:15pm ~15-20 minutes. Barge off of Fan Pier.

7/15/26: Sail Boston show #2, 9:15pm ~15-20 minutes. Barge off of Fan Pier.

Monday, July 06, 2026

Art Openings at Gallery at 249 A and FP3

The 249 A Street Artists Cooperative presents Oil and Water, Paintings and Drawings, by Dan Osterman and Bruce Rogovin on exhibit July 9th through August 22nd. Join the artists at the opening reception this Thursday, July 9th from 6pm to 8pm at Gallery at 249 A. 


Dan Osterman

Bruce Rogovin


The FP3 Gallery at 346 Congress Street presents Informed Choices, Paintings by Michael Bourque. The opening reception will take place July 14, 2026 from 5pm to 7pm. 

Michael Bourque

Informed Choices is a curated collection of Michael Bourque’s paintings in the mark making style of his art. Mark making illustrates the power of each individual brushstroke and is the basis of his unique style. Repetition makes each brushstroke even more powerful while enhanced with the use of color, which is layered. Flashes of color peek through the pattern to add to the visual interest and colors are made brighter by juxtaposition to contrasting colors while strong shapes are made stronger with the heavy application of paint. The effect is to invigorate the entire work, and to create rich surface textures. The entire methodology reflects informed choices.

Friday, July 03, 2026

FPNA Summer Neighborhood Gathering June 30th!

updated 7/3/26 with speaker presentations and neighborhood updates. 

 You are invited to a
Summer Neighborhood Gathering

Tuesday, June 30, 2026
6 pm to 8 pm
Community Work Lounge, 15 Necco St
& via zoom


featuring

State Senator Nick Collins: A Legislative Update

Fort Point Channel  Near Term Resilient Infrastructure Recap*
Benjamin Matusow

City of Boston Coastal Resilience Delivery Team

 Summer in the Seaport
Jess Chen, WS Development

A Street, Sleeper St  & Congress St. Improvements Project Update
Audrey Ng, City of Boston Streets Cabinet


introducing
Kids in Tech
coming to 5 Necco's non-profit Chapter 91 space 
Olu Ibrahim, Founder, President & CEO

plus
 Neighborhood News & Updates


* Please note that this presentation will be a recap of  the 6/24th Resilient Fort Point Channel Virtual Information Session and 6/29th Open House + Site Walks with the opportunity to provide comments and ask questions. We encourage you to attend the Open House + Site Walks. The 6/24th presentation and recording should be posted by June 29th.

Next Neighborhood Gathering will be September 29, 2026

originally published 06.23.26

Wednesday, July 01, 2026

Reserved Channel Redevelopment: State, City, Developer & Public

The Reserved Channel Development is a 42 acre mixed use development on over 38 acres of Massport leased land and 3.8 acres owned by Pappas and Oxford Properties. 

On July 7th, there will be a developer hosted Citizens Advisory Committee (CAC) & Public MEPA Draft Environmental Impact Report (DEIR) meeting for Phase 1 of the Master Plan at 6pm.


DEIR public comments are due July 10th to MEPA analyst Alex Strysky



Reserved Channel Development - Block A1 and A2- draft planned development area (PDA) was submitted to the Boston Planning Department on June 15th The proposed PDA at 370 West First will redevelop a portion of the project site into a mixed-use residential project containing approximately 312,000 square feet of gross floor area, including approximately 287 residential units, approximately 10,000 square feet of ground level active uses, and indoor and outdoor amenity space.

Boston Planning CAC & Public Meetings will be scheduled.

Reserved Channel Development Block A1 & A2 public comment deadline is August 3rd.