Showing posts with label 5 Necco Court. Show all posts
Showing posts with label 5 Necco Court. Show all posts

Monday, October 06, 2025

Fort Point Landmarks October 2025 Meeting

 THE FORT POINT CHANNEL LANDMARK DISTRICT COMMISSION
will hold a public hearing on:
Thursday, October 9, 2025  
6:00 PM

This hearing will be held virtually and NOT in person.

You can participate in this hearing by going to the Zoom meeting link or by calling 646-828-7666 and entering meeting id 161 673 9227#. You may also submit written comments or questions to FortPointLDC@boston. 

I.  DESIGN REVIEW HEARING

APP # 26.0231 FPC    5 NECCO STREET
Applicant: Adam Kahn 
Proposed Work: Paint company logo at corners of building. See additional items under administrative review

APP # 26.0297 FPC   64 SLEEPER STREET
Applicant: Cassandra Martinez
Proposed Work: Installation of a deployable stop log barrier across the walkway underneath the pedestrian bridge in Martin’s Park, including installation of a level concrete sill and embedded footing across the walkway; installation of cast-in-place concrete walls and footings among the granite blocks on either side of the walkway; and installation of a gate valve on the existing drain line that runs beneath the walkway in this area. See additional items under administrative review. 

II.  ADMINISTRATIVE REVIEW/APPROVAL

APP # 26.0231 FPC 5 NECCO STREET: Install new signage at entryway. 

APP # 26.0297 FPC 64 SLEEPER STREET: Placement of new granite blocks from the same quarry as existing, minimal grounding of existing fractured or uneven rocks and injection of epoxy into cracks between rocks. All features will be restored or enhanced to match their original condition upon completion.

APP # 26.0246 FPC 253 SUMMER STREET: Emergency masonry repairs - repair and replace sills in kind; install helical ties into the mortar joints; remove and reuse/repair/reset/replace bricks in kind; new mortar to match existing; sealant to match existing mortar color.

III.  RATIFICATION OF 8/14/2025 Hearing Minutes

IV.  STAFF UPDATES

V.  PROJECTED ADJOURNMENT: 7:00 PM

Members: David Berarducci, Vacancy, Thomas Rodde, Vacancy, Vacancy, Alternates: Vacancy, Raber Umphenour

Thursday, March 13, 2025

Fort Point Landmarks March 2025 Meeting

 THE FORT POINT CHANNEL LANDMARK DISTRICT COMMISSION

will hold a public hearing on:
Thursday, March13, 2025
6:00 PM

This hearing will be held virtually and NOT in person. 
You can participate in this hearing by going to the Zoom meeting link 
or by calling 929-436-2866 and entering meeting id 964 8126 4882#  You may also submit written comments or questions to FortPointLDC@boston.

I.  DESIGN REVIEW HEARING

APP # 25.0646 FPC 268 SUMMER STREET 
Applicant: Joseph Juliano 
Proposed Work: Install new sign mounted to front facade

II.  ADMINISTRATIVE REVIEW/APPROVAL

APP # 25.0661 FPC HARBORWALK BEHIND 5 NECCO STREETInstall new two-sided map kiosk as required by DEP following the dimensions and color scheme of the Boston Harborwalk Signage Style Guide.

III.  RATIFICATION OF 2/13/25 PUBLIC HEARING MINUTES

IV.  STAFF UPDATES

V.  PROJECTED ADJOURNMENT: 7:30 PM

Members: David Berarducci, Susan Goganian, Thomas Rodde, Vacancy, Vacancy Alternates: Vacancy, Raber Umphenour

Thursday, February 13, 2025

Fort Point Landmarks February 2025 Public Meeting

updated 2/13/25 with application presentations.

THE FORT POINT CHANNEL LANDMARK DISTRICT COMMISSION
will hold a public hearing on:

Thursday, February 13, 2025
6:00 PM

This hearing will be held virtually and NOT in person. 
You can participate in this hearing by going to the Zoom meeting link 
or by calling 929-436-2866 and entering meeting id 955 0057 3484# You can also submit written comments or questions to FortPointLDC@boston.

I.  DESIGN REVIEW HEARING

APP # 25.0466 FPC  332 CONGRESS STREET 
Applicant: Daniel Brennan
Proposed Work: Replace single entry door; Replace two fixed windows with accordion style operable windows; Paint pilasters, portion of cornice, and entry doors; Install (3) three sconce light fixtures; Install blade sign at far left pilaster; Install individual letter signage affixed to an LED raceway Center on two windows; install vinyl window decals at entry door. Continued from the 12/12/24 Public Hearing. 

APP # 25.0521 FPC         259-267 SUMMER STREET 
Applicant: Adam Burns
Proposed Work: Selective updates to the southern façade, replacing one column of masonry window infills with historic windows spanning floors 1-8; replace one column of louvers on floors 2-8. Remove the infill of three at-grade windows and replace them with historic windows. Continued from the 1/23/25 Public Hearing

APP # 25.0531 FPC 266 SUMMER STREET Moved to Administrative Review
Applicant: Erik Minneart
Proposed Work: Installation of two new 16" round 
non-illuminated blade signs; Installation of decal on building entry door.

II.  Administrative Review

APP # 25.0573 FPC 5 NECCO STREETInstallation of storefront and blade signage for Backyard Fitness that includes halo lit channel letters and logo; Installation of "Coming Soon" vinyl decals for existing storefront entrance to be removed at the end of April 2025 (removed by applicant).

APP # 25.0531 FPC 266 SUMMER STREET Installation of two new 16" round non-illuminated blade signs; Installation of decal on building entry door (moved from design review by staff).

II. RATIFICATION OF 1/23/25 PUBLIC HEARING MINUTES

II.  STAFF UPDATES

IV. PROJECTED ADJOURNMENT: 7:30 PM

FORT POINT CHANNEL LANDMARK DISTRICT COMMISSION
Members: David Berarducci, Susan Goganian, Thomas Rodde , Vacancy, Vacancy
Alternates: Vacancy, Raber Umphenour

originally published 02.10.25

Thursday, October 10, 2024

Fort Point Landmarks October 2024 Public Meeting

THE FORT POINT CHANNEL LANDMARK DISTRICT COMMISSION
will hold a public hearing on:

Thursday, October 10, 2024
6:00 PM

This hearing will be held virtually and NOT in person. 
You can participate in this hearing by going to the Zoom meeting link 
or by calling 929-436-2866 and entering meeting id 932 6902 0636You can also submit written comments or questions to FortPointLDC@boston.

I.  DESIGN REVIEW HEARING

APP # 25.0263 FPC   10 NECCO STREET
Applicant: Marie O'Brien
Proposed Work: Removal of 17 dead pear trees on Necco Street and Necco Ct. and replace with new honey locust trees.

APP # 25.0271 FPC  5 NECCO STREET
Applicant: Eileen Malvesti
Proposed Work: A signage masterplan for the 5 Necco Street building to be utilized by future tenants.

APP # 25.0274 FPC  5 NECCO STREET
Applicant: Eileen Malvesti
Proposed Work: The proposed sign consists of painted white aluminum, internally lit letters.  They will be individually mounted with studs into the mortar joints of the brick on the east side of 5 Necco Street facing the Harborwalk.

II.  ADMINISTRATIVE REVIEW

APP # 25.0299 FPC 12 FARNSWORTH STREETInstall new exterior logo panel to replace the existing top panel in the same location mounted through the mortar joints.  Withdrawn by applicant. 

APP # 25.0224 FPC 311 SUMMER STREET
Install new signage: Painted aluminum logo; Non-illuminated blade signs; Vinyl logos on entry doors.

III RATIFICATION OF 6/13/24 PUBLIC HEARING MINUTES

IV STAFF UPDATES

PROJECTED ADJOURNMENT: 7:30 PM

FORT POINT CHANNEL LANDMARK DISTRICT COMMISSION
Members: David Berarducci, Susan Goganian, Vacancy, Vacancy, Vacancy Alternates: Thomas Rodde, Vacancy 

Sunday, April 21, 2024

April Showers Highlight Coastal Resilience & New Developments Spring Up

updated 4/21/24 with meeting presentations and recordings. 

4/4: Federal Flood Hazard Zoning Updates Info Session at 6pm to review updated flood insurance maps and Article 25 zoning updates with the opportunity to ask questions about changes and insurance implications. View presentation and recording and Special Flood Hazard Area Change Viewer. 

4/6: Love Your Block Neighborhood Cleanup from 10am -12pm at Wormwood Park. Rain date is 4/7.

4/8: 232 A Street Public Meeting at 6pm to discuss the 7th Amendment to PDA 69, the Development Plan and the response to the BPDA Request for Additional Information. View presentation and meeting recording.

4/10: Waterfront Space Planning Study Public Meeting 
at 6pm. Hear recommendations to reform and improve the Chapter 91 Civic/Cultural FPA Space processes and provide feedback. View presentation. View meeting recording


4/22: Reserved Channel Development Community Advisory Committee (CAC) Meeting at 6pm. The project is an 8 acres development with eight new buildings of proposed uses including a variety of commercial, research and development, civic, and residential housing. This CAC is a joint BPDA and MEPA review group. This meeting will lay out the process.  

4/23: Reserved Channel Development Kick-off Meeting at 6pm at the Condon School, 200 D St. Oxford Properties Group and Pappas Enterprises, is hosting this in-person meeting to discuss the proposed project. This event is the first in a series of four meetings to review the entirety of the proposed project. Later meetings will have more specific topics, including transportation infrastructure, resiliency, public realm and open space, and built form.  

MEPA Certificates & Comment Deadlines
3/25: 2 Harbor Building 2: Draft Environmental Impact Report (DEIR) not required. 
4/1: 232 A Street DEIR adequately and properly complies with MEPA. The Proponent may prepare and submit for review a Final Environmental Impact Report (FEIR).
4/1:Reserved Channel Special Review Procedure Established


4/7: 5 Necco and 15 Necco Chapter 91 Management Plan comment deadline. 

4/30: Reminder- MassDEP Climate Resilience Draft Regulations for Waterways (Chapter 91) and Wetlands comment deadline.

  • Send Waterways Resilience comments to dep.waterways@mass.gov with Waterways Resilience Comments in the subject line.
  • Send Wetlands Resilience comments to dep.wetlands@mass.gov with Wetlands-401 Resilience Comments in the subject 

Wednesday, March 20, 2024

Fort Point Landmarks March 2024 Meeting

updated 3/13:  rescheduled from March 19th to March 27th at 6 PM in order to have a a quorum of Commissioners present.

THE FORT POINT CHANNEL LANDMARK DISTRICT COMMISSION

will hold a public hearing on:

Wednesday March 27, 2024 (newer date)
6:00 PM
This hearing will be held virtually and NOT in person. 
You can participate in this hearing by going to the Zoom meeting link or by
calling  929-436-2866 and entering meeting id 956 3126 7399#.You can also submit written comments or questions to FortPointLDC@boston.

I.  DESIGN REVIEW HEARING

APP # 24.0513 FPC  30 THOMSON PLACE
Applicant: Nathan Turner
Proposed Work: Installation of wall mounted ductwork, condensers and exhaust openings to support a new high-end Italian best in class pizzeria.

APP # 24.0751 FPC 372 CONGRESS STREET(moved to administrative review)
Applicant: Pamela Jagiello
Proposed Work: Recover three existing awning frames with Navy Blue Sunbrella and letter with white letters, JUST SALAD. Replace existing 24" diameter blade sign with new illuminated blade, same size, same location. 24"x 24", Just salad logo, blue background with white logo. Assorted white window lettering, door with hours, logo on front glass.

APP # 24.0517 FPC  7 CHANNEL CENTER STREET
Applicant: Phil Marcotty
Proposed Work: Redevelopment of the existing property at 7 Channel Center including the construction of a new 9-story building.

 II.  ADMINISTRATIVE REVIEW/APPROVAL

APP # 24.0702 FPC 319 A STREET: Install (1) set of fabricated aluminum letters 
to existing I beam canopy on west elevation to read: "Citrus & Salt."

APP # 24.0648 FPC 5 NECCO STREET: Replacement of a portion of the existing top floor glass wall with an approximately 7’-10” x 23’-4” foot folding door.

III.  RATIFICATION OF 1/11/24 PUBLIC HEARING MINUTES

IV.  STAFF UPDATES

PROJECTED ADJOURNMENT: 8:15 PM

FORT POINT CHANNEL LANDMARK DISTRICT COMMISSION
David Berarducci, Susan Goganian, Lynn Smiledge, Vacancy, Vacancy Alternates: Thomas Rodde, Vacancy

originally published 03.06.24

Friday, February 09, 2024

Fort Point Landmarks February 2024 Meeting

2/9/24: cancelled due to not enough Commissioners present to reach quorum.

 THE FORT POINT CHANNEL LANDMARK DISTRICT COMMISSION

will hold a public hearing on:

Thursday, February 8, 2024
6:00 PM
This hearing will be held virtually and NOT in person. 
You can participate in this hearing by going to the Zoom meeting link or by
calling  929-436-2866 and entering meeting id 913 9623 4842#.You can also submit written comments or questions to FortPointLDC@boston.

I.  DESIGN REVIEW HEARING

APP # 24.0513 FPC  30 THOMSON PLACE
Applicant: Nathan Turner
Proposed Work: Installation of wall mounted ductwork, condensers and exhaust openings to support a new high-end Italian best in class pizzeria.

APP # 24.0517 FPC  7 CHANNEL CENTER STREET
Applicant: Phil Marcotty
Proposed Work: Redevelopment of the existing property at 7 Channel Center including the construction of a new 9-story building.

 II.  ADMINISTRATIVE REVIEW/APPROVAL

APP # 24.0648 FPC 5 NECCO STREET: Replacement of a portion of the existing top floor glass wall with an approximately 7’-10” x 23’-4” foot folding door.

III.  RATIFICATION OF 1/11/24 PUBLIC HEARING MINUTES

IV.  STAFF UPDATES

PROJECTED ADJOURNMENT: 7:15 PM

FORT POINT CHANNEL LANDMARK DISTRICT COMMISSION
David Berarducci, Susan Goganian, Lynn Smiledge, Vacancy, Vacancy Alternates: Thomas Rodde, Vacancy

originally posted 02.08.24

Thursday, May 11, 2023

Fort Point Landmarks May 2023 Meeting

updated 5/11/22 with presentations.

THE FORT POINT CHANNEL LANDMARK DISTRICT COMMISSION
will hold a public hearing on:

Thursday, May 11, 2023
6:00 PM
This hearing will be held virtually and NOT in person. 
You can participate in this hearing by going to the Zoom meeting link or by
calling  929-436-2866 and entering meeting id   995 6454 2847#.You can also submit written comments or questions to FortPointLDC@boston.

I.  DESIGN REVIEW HEARING

PP # 23.0588 FPC   280 SUMMER STREET
Applicant: David Woolaver
Proposed Work: Re-cladding all of the rotted window wooden trim with a matching aluminum.  Continued from the April 13, 2023 hearing. 

APP # 23.0898 FPC  25 THOMSON PLACE
Applicant: Brook Hindle 
Proposed Work: Installation of temporary SAV vinyl sticker signage to the windows. 

APP # 23.0917 FPC   5 NECCO STREET
Applicant: Sherry Clancy 
Proposed Work: Relocate west wall of existing transformer fence 1-4' closer to the transformer as well as landscaping improvements. 

APP # 23.0920 FPC    51 MELCHER STREET
Applicant: Alex Munoz 
Proposed Work: Streetscape improvements along Melcher Street including tree pits, bike racks and bollards; streetscape and accessibility improvements at the Melcher and A Street intersection including accessible curb ramps. Continued from the March 9, 2023 hearing. 

APP # 23.0907 FPC   17 FARNSWORTH STREET
Applicant: Nick Cassaro 
Proposed Work: Convert the existing building to office and laboratory uses. The new building will have a building height of approximately 67 feet compatible with the height of adjacent buildings to the north and south; a mechanical penthouse set back from Farnsworth Street; other rooftop mechanical equipment screened from view; a metal-frame facade with punched windows on its easterly and westerly facades to reflect the area’s post-industrial character.

II   RATIFICATION OF 4/11/23 PUBLIC HEARING MINUTES

III  STAFF UPDATES

 IV  PROJECTED ADJOURNMENT: 7:30 PM

FORT POINT CHANNEL LANDMARK DISTRICT COMMISSION
David Berarducci, Susan Goganian, John Karoff, Lynn Smiledge, Vacancy, Alternates: Thomas Rodde, Vacancy 

originally published 5.4.23

Tuesday, August 09, 2022

Fort Point Landmarks August 2022 Meeting This Thursday

The FORT POINT CHANNEL LANDMARK DISTRICT COMMISSION will hold a public hearing on:

Thursday, August 11, 2022
6:00 PM

This hearing will be held virtually and NOT in person. 
You can participate in this hearing by going to the Zoom meeting link 
or by calling 929-205-6099 and entering meeting id 810 4777 1835# You can also submit written comments or questions to FortPointLDC@boston.

I.  DESIGN REVIEW HEARING

APP # 22.1421 FPC   25 THOMSON PLACE
Applicant: Bernard Lebow
Proposed work: Install one 11’ x 25’ black aluminum plaque below existing plaque into the mortar joints.

APP # 23.0035 FPC   372 CONGRESS STREET
Applicant: Andrew Lafuente
Proposed work: Using existing metal frame replace fabric and painted signage of valance and awnings.

APP # 23.0079 FP   300 A Street
Applicant: Gabriel Zavala
Proposed work: Paint various existing front facade features.

APP # 22.1262 FPC   303 CONGRESS STREET
Applicant: Dorothy Deak
Proposed work: Installation of sunshade.

Applicant: ARE-MA Region 74, LLC
Proposed work: Install Chapter 91 Interpretive sign on the Harborwalk consisting of a 2’ x 4’ graphic featuring historic images sitting on a 4’ high black powder coated base to be attached to an existing deck platform.

II. RATIFICATION OF 7/14/2022 PUBLIC HEARING MINUTES

III. STAFF UPDATES

IV. PROJECTED ADJOURNMENT: 8:00 PM

FORT POINT CHANNEL LANDMARK DISTRICT COMMISSION
David Berarducci, Susan Goganian, John Karoff, Lynn Smiledge, Vacancy
Alternates: Thomas Rodde, Vacancy

Monday, December 21, 2020

5 & 15 Necco Ground Floor Uses: New Chapter 91 License 12/3 Meeting

updated 12/21/20: Reminder the public comment deadline is Wednesday, December 23, 2020. Details below. 

The Massachusetts Department of Environmental Protection (MassDEP) Waterway Regulations Program (Chapter 91) will be holding a new virtual hearing regarding the Chapter 91 license for 5 & 15 Necco on:

Thursday, December 3, 2020


The November 23, 2020 public  notice will start a new 30 day comment period ending December 23, 2020.

Previous Application Submissions

The applicants, ARE-MA Region No. 74, LLC and ARE-MA Region No. 72, LLC (Alexandria Real Estate Equities and National Development), are seeking a Consolidated Written Determination to reauthorize the uses of two (2) 6-story existing office buildings at 5 Necco Street; construction and maintenance of a 12-story new office building at 15 Necco Street; and associated open spaces and public amenities located on filled tidelands of the Fort Point Channel at 5 and 15 Necco Street, Boston, Suffolk County. Additionally, the Applicant seeks an extended license term pursuant to 310 CMR 9.15(b). The proposed project has been determined to be Nonwater-Dependent.

NEW Public Comments Deadline: December 23, 2020
Written comments should be addressed to: Susan You via email. If you do not have access to email, hard copy documents may be mailed to: MassDEP Waterways Regulation Program c/o Susan You, One Winter St, 5th Floor, Boston, MA 02108.

Failure of any aggrieved person or group of ten (10) citizens or more to submit written comments to the Waterways Regulation Program by the Public Comments Deadline will result in the waiver of any right to an adjudicatory hearing in accordance with 310 CMR 9.13(4)(c). The group of citizens must include at least five (5) citizens who are residents of the municipality in which the proposed project is located.

Wednesday, September 09, 2020

What Will Become Of The Channelside Parking Lot?

updated 9/9/20: Added 9/10 BPDA board meeting. Previous update included presentations and video links for public meetings hosted by the Boston Planning and Development Agency (BPDA) to cover planned development of the parking lot along A Street and along the Fort Point Channel.

Related Beal (244 - 284 A Street) and National Development & Alexandria Real Estate Equities (15 Necco  & 5 Necco Street) have projects planned for the neighborhood adding 4 new buildings and including 2 historic buildings.


15 Necco (former GE Headquarters) as of 08/04/20
15 NECCO ST.  (former GE headquarters)

BPDA Board Meeting
Thursday, September 10, 2020
Testimony should be submitted by Thursday at 3:30 PM to bpdaboard@boston.gov

BPDA Final Public Community Meeting
Wednesday, September 2, 2020
National Development & Alexandria Real Estate 
6:00 p.m. via Zoom meeting
View Presentation
Watch meeting



After the meeting, please email your comments by Monday, September 7 to:

BPDA Project Manager Aisling Kerr
BPDA Deputy Director for Climate Change and Environmental Planning Rich McGuinness 
BPDA Senior Resilience & Waterfront Planner Joe Christo
District City Councilor Ed Flynn
Councilor-At-Large Michael Flaherty
State Senator Nick Collins
State Representative David Biele 
FPNA 


244 - 284 A ST (former Channelside parking lot) 

Boston Civic Design Commission
244- 284 A Street (former Gillette Channelside parking lot)
Tuesday, Sept. 1, 2020
approximately 6 pm (meeting starts at 5:15 pm)
View Presentation

BPDA Public Community Meeting Kickoff 
Wednesday, August 26, 2020
Sneak preview of Presentation
Watch meeting



originally published 08.18.20

Tuesday, July 09, 2019

Fort Point Landmarks July 2019 Meeting

The FORT POINT CHANNEL LANDMARK DISTRICT COMMISSION will hold a public hearing on:

Thursday, July 11, 2019
6:00 PM
Boston City Hall - Piemonte Room (5th Floor)
After 5:30 pm, enter and exit City Hall at the Dock Square entrance on Congress Street 
(across from Faneuil Hall).

Subject of the hearing will be applications for Certificates of Design Approval on the agenda below, review of architectural violations and such business as may come before the commission, in accordance with Ch. 772 of the Acts of 1975, as amended.

I.  DESIGN REVIEW HEARING

APP # 19.1418 FPC    5 Necco Court
Applicant: Peter Cavanaugh; General Electric
Proposed Work: Adjustments to the previously approved windows, signage, landscaping, and bridge.


III. Ratification of 06/13/2019 Public Hearing Minutes
IV. Staff Updates
V. Projected Adjournment: 6:3O PM
FORT POINT CHANNEL LANDMARK DISTRICT COMMISSION
David Berarducci, Susan Goganian, John Karoff, Lynn Smiledge, Vacancy 
Alternates: Thomas Rodde, Vacancy

Wednesday, February 13, 2019

GE Innovation Point February 2019 Construction Update

GE Innovation Point is transforming as reconstruction continues along the Harborwalk as the weather permits, windows continue to be installed, lots of steel, roof work and expect to see the metal skin of the green pedestrian bridge removed along with other structural improvements. 

·         Pedestrian traffic has been relocated onto the first phase of the Harborwalk sidewalk.  The balance of the Harborwalk reconstruction, Phase 2, from the trailers to Necco Ct. is continuing as weather permits.  Overlook deck framing is complete, deck construction will continue as weather permits.  The Phase 2 harborwalk concrete sidewalk will be placed as weather conditions permit.  Temporary access to the dock is maintained daily.  Landscaping and certain plantings will be completed in the early spring of 2019 to meet planting season requirements. 

·         Temporary heating units have been installed and are providing heat through temporary ducts from both the west face and the east face of the buildings.  These units will remain in operation throughout the winter months.  Certain portions of the building are being wrapped or tented to allow masonry, concrete, and other construction to continue.  The openings in the building are being closed up on a permanent basis as work progresses.

·         Structural steel erection for the west building high roof, mechanical screen supports and 6th floor is complete.  Concrete has been placed on the 6th floor.  The concrete high roof deck slab will be placed on the west building during February, after which placement of the permanent roofing will commence.

·         Structural steel erection for the east building will complete in February.  The east building steel has been tied into the glass enclosure structure between the buildings.  The low roof steel and deck are in place, the high roof steel structure and mechanical screen supports above the low roof are being erected.   With completion of the low roof the new concrete block stair shaft masonry work in the northwest corner of the building is underway and will complete this month.  The northwest corner of the concrete decks on the 2nd through 5th floors of the east building are being prepared for concrete now that the stair shaft is above the low roof.   Preparations for placement of the low roof concrete deck are underway and will complete this month.  The placement of permanent roofing on the east building will commence once the concrete decks are placed. 

·         The crane continues to support the erection of the structural steel.  The current crawler crane will be removed from the site mid-February.  Mobile cranes will be used as additional equipment and materials need to be hoisted into the building.

·         Cutting and repointing of the exterior masonry façades is one of the activities that is temperature sensitive.   Cutting and repointing is continuing in the area that has been tented and heated between the buildings.  Washing of the masonry facades has been postponed until temperatures permit completion of this work. 

·         The construction of the new large openings in the south and west faces of the first floor of the west building and on the south face of the east building continues.   Once the opening is made, steel framing is placed supporting the existing masonry wall, then the masonry is reconstructed around the steel frame.  The work on the large openings will continue. 

·         Window installation is continuing in both buildings.  Caulking and sealing around the new windows as well as placement of window trim is in progress and will continue. 

·         Rough-in of interior walls and interior masonry restoration is underway in the west building.  Mechanical, electrical, plumbing and fire protection rough-in is continuing on the first 4 floors of the west building.  This will expand onto the 5th floor once the permanent roof is in place.  Rough in of the ductwork and piping risers in the west building core is complete.

·         Rough-in of interior walls and interior masonry restoration is underway in the east building.  The mezzanine level partitions are constructed with building infrastructure installation underway.  Electrical, mechanical and plumbing rough-in is continuing in the first 3 floors of the east building.  Rough in of the ductwork and piping risers is nearing completion in the core of the east building.  The passenger and freight elevator installation will begin in late February.

·         The new column for the Necco Ct. bridge has been placed.  The base of the column will be encased in concrete to protect it from vehicles.   Scaffolding erection on both sides of the Necco Ct. bridge to the full height of the bridge is underway and will complete in mid-February.   Removal of the existing metal panel skin will be performed first with structural improvements to the bridge steel following the removal.  Fabrication of structural steel, curtainwall and metal panels for the bridge reconstruction is underway.  Abatement of lead-based paint from structural members inside the bridge will continue in order to prepare the surfaces for welding.  GE and its contractors will continue to coordinate the work in Necco Ct. with Synergy. 

·         The final transformer has been placed in the transformer yard by Eversource.  The main electrical gear has been placed inside the main electrical room inside the building and is being prepared to receive permanent power.  Once all electrical gear testing and inspections are complete, Eversource will energize the permanent power to the building. 


·         National Grid will provide a permanent gas service connection to the buildings from Necco St.  This will require trenching in Necco St.  Tie-in is currently forecast to be performed this Spring pending final schedule from National Grid.

GE Innovation Point Construction updates occur about monthly in frequency or when there are major transitions in the construction process. Visit GE Reports to sign up for updates and to find the latest information or contact GE at innovation.point@ge.com.